on 08-04-2014 6:03 PM
Hello,
We are implementing BI and currently we only installed BI ABAP Stack only, customer will look for reporting and dash boards In future. Customer also has plan to implement SAP Business Objects. Could you please advise me here
Do we need BI Java stack for BOBJ ? With out Java can we do reporting and dash boards ? Can some one please help me to understand
Please
Thanks,
Aravind
see thread - AS ABAP Java Installation
Best Regards Roland
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
SAP Business Objects Business Intelligence 4.0 is installed on any machine ( windows/unix, depending on your architecture). It is integrated with a backend BW(also called BI) system. Now this BW(BI) system needs to be dual stack ( both ABAP and JAVA; as many features of SAP Business Objects Business Intelligence 4.0 requires BW java portal).
You cannot add ABAP ( like an add-on) to already installed java stack. ( though the reverse is possible, but not with NW 7.3).
What you can do now is to install NW 7.3 ABAP as a separate system and then integrate your NW java with your ABAP ( i.e, change the UME from java databse to ABAP in your java stack). This has to be done as ABAP+JAVA installation option ( as a single instance) is not available for NW 7.3 ( exception being for PI and Solution Manager). No further change in SAP Business Objects Business Intelligence 4.0 is required.
For more infor refer to
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.