on 08-21-2014 10:39 AM
Hi All,
May i know any settings for default the Costing Lot Size follow by material type?
Example:
Material A - Type is ZFIN - So after i upload material into MM the Costing Lot Size will auto prompt 10,000
Material B - Type is ZPAC - So after i upload material into MM the Costing Lot Size will auto prompt 1,000
Thank You.
Hi All,
Thanks for all of your reply. Will contact Abap team and figure out this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can do this by user exist. Please check with ABAPer.
Regards,
Mukthar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
There is not setting or Config to set Material Type wise Costing Lot size.
System will read the data from MARC-MARC while running the standard cost estimate as per the standard process of SAP-Costing.
Regd.
Khan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sky,
I have not seen any configuration, though i am still trying to check in SAP system.
But in our case, we are using MDM tool where we have logic in place.
Regards
Mohit Singla
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.