Activity Type / Variance Report

Former Member
0 Kudos

A report of activity type is required product wise and a detailed cost estimate variance report of list of components in BOM with activity type is required with comparison to the previous cost estimate.

Is it available in standard (TCODE ?) or will be created in report painter or will be develop through ABAP?

N.B. Material Ledger is not activated and variant configuration and COPA is configured.

Accepted Solutions (1)

Accepted Solutions (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

See S_ALR_87099932

Regards

Rajneesh

Answers (1)

Answers (1)

mansoor_khan4
Active Participant
0 Kudos

Hi Haris,

Please check the below reports

S_P99_41000111 - Analyze/Compare Material Cost Estimates

Regd,

Khan Mansoor.