Multiple Cost Simulations for Pricing Decision

Former Member
0 Kudos

There was an issue during board meeting when future orders needed to be simulated with different material variants having same BOM but with different variants for price decision. There is not enough time during a meeting to change the variants in the BOM.

Is future costing for proposed order with existing cost or with proposed new rates for all inputs (activity type planning; energy, repair and maintenance and production supplies) functionality is available in SAP CO ERP or it will be done through BPS or analytics modules only? BOM will be same but there are 15 variants for the material to be simulated for cost estimate.

N.B. Material ledger is not activated; variant configuration is on.

Accepted Solutions (1)

Accepted Solutions (1)

dawoodkhalid
Active Participant
0 Kudos

Future costing is not possible in ERP. This is the feature of analytics.

mansoor_khan4
Active Participant
0 Kudos

Hi,

Better it will go with BPS.

Regd,

Khan.

Answers (0)