on 08-25-2014 6:58 AM
Hi,
I've got existing Network templates set up for various company codes. The std networks are linked to std wbs elements. This creates a full project structure when coping the standard network in CJ20N.
However, on an existing company code and plant, I am creating a network template with std wbs assignment, the point at which the other networks jump to the WBS create screen to replace WBS / Proj numbers etc... is NOT HAPPENING. The system immediately asks for a OPERATIVE WBS to be entered.
This company code specifically requested in the past that that their users only use operative WBS elements. Question: Where is it possible to set this restriction for a specific company code / org unit so the std network ignores the std wbs assignment and requests an operative WBS entry?
Thanks
Kru
Solution:
OPUA - field selection for Network Header.
WBS Element field: Set as REQUIRED.
Double Click WBS Element
New Entry
Network Profile: **Enter Network Profile created.
Select Display ONLY
This will now set the WBS field as required on Network Header level: EXCEPT for the Network Profiles (plant) entered at the second level.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Krushan,
I am not clear what you need here?? Is it that you want to remove the check which is asking for a Operative WBS instead of standard for a particular company code?
My guess would be to check for any enhancements done for CJ01 tcode, using SMOD or CMOD.
Hope it helps you.
Cheers
Sammar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.