on 08-26-2014 12:54 PM
Hi all
I have the following scenario:
We are doing multiple GRs for the same material/batch/PO combination and want these to update the same inspection lot as QI stock. However once we have done a positive UD for this inspection lot if we get another receipts for this combination we want to create a new inspection lot.
From using the indicators on the material master, I can't get this to happen as all the subsequent GRs once the UD is carried out post to unrestricted stock as I guess SAP thinks that the inspection is finished for this combination.
Any ideas ?
Thanks in advance.
Alistair
Helo,
I do have a different observation.
When a GR is done against a combo of PO/Mat/Batch, one inspection lot is generated. Let say inspection lot (or GR) quantity is 100 EA. This is posted to UR stock but UD is not done.
Now if another GR is done for the same combo, new inspection lot is generated.
I couldn't understand this behavior and logic applied. This is somewhat similar query and like you guys to please give an explanation.
~Karen~
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Helo
It is set to X For each Purchase order item, batch and storage location.
I would like to add here that if UD (as accepted) is given, then no further inspection lot is generated for the same combo.
Whereas, if UD is due and quantity is lying into quality stock, further GR would only add to QI stock against the same inspection lot.
~Karen~
Have you tried using 1 - each material document, material, batch & storage location?
This will create an inspection lot for each receipt. The downside is that if you have an open inspection lot with QI stock, it will not add a new receipt to the open lot but will create a new one.
In most of the pharma's and chemical firms I've been in, the downside doesn't happen very often in reality. Besides, if these are two different shipments, received in at different times/days, then their inspections should be done independently of each other. Otherwise to properly test, you would need to pool samples together and test the composite sample. Which could be considered invalid since the material could have been subjected to different conditions during storage and transport which might affect its' properties. I don't know what your particular industry is however.
Craig
Hi Alistair,
For your first querry:
This is standard functionality as when you are doing multiple GRs for same material, batch, vendor and PO combination, only one inspection lot is created and subsequesnt GR quantity is updated in same inspection lot as per your material master setting. Once the UD is accepted and stock is posted to unrestricted stock, any further GRs for same combination is directly posted to unrestricted stock. This is because when a perticular material batch is received with same vendor/PO and if this is accepted during UD then this means whole batch is OK.
Regards,
Gururaj Kulkarni
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Alistair,
You are right, this is standard functionality in SAP. If its suitable you can select "rejected" valuation for the "Accept" decision code in corresponding selected set.
Otherwise you may have to go for customization.
Amol.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.