cancel
Showing results for 
Search instead for 
Did you mean: 

Configuration with -ve time management

Former Member
0 Kudos

Dear Guru,

Initially we have done the +VE Time management configuration.By doing this activity, we were calculating OT and generating Absence Quotas.

So now i have to change the configuration from +VE TM to -VE TM.

So please advice what kind of changes are required on configuration,schema and Pcr level.

Shall i use schema TM04, or TM01. please suggest.

Highly appreciate for quick reply.

Regards,

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Rohan

Schema you have to copy TM04 and how exactly you want to generate quota you have to think and decide

BR

Anil

Former Member
0 Kudos

Hi Anil,

Thanks for reply.

Please suugest, what kind of changes are required to configure the negative time managemnet.

regards,

sharma

Former Member
0 Kudos

Hi,

You need to change the Absence quota configuration V_556A_B – Automatic Accural for Absence Quota please assign"No Generation" and need to define Generation rule as per requirement V_T559L and use report RPTQTA00 to generate quota hence forth.

Former Member
0 Kudos

Hi Sap Performer,

I appreciate to you for the reply.

But in negative time management we can also generate absence quota by Time evulaton.

Please correct if i am wrong.

Regards,

sharma

Former Member
0 Kudos

yes we can

Former Member
0 Kudos

Hi

What you want to do now, it's depend on your requirement to do.

Now you don't want to generate OT automatically, tell me your requirement.

Former Member
0 Kudos

Hi Kedhar,


Thanks for reply


I want to generate the absence quota, leave encasement, settlements and lop.

please advice


regards,\

sharma

Former Member
0 Kudos

Hi Rohan,

You can use TM04 and for Quota generation you need to done through RPTQTA00 instead of your time evaluation (check sap performer solution),

and Leave encashment (cumulation class28), lop you can done through normal configuration process.

All the best,

:Kedhar