on 08-29-2014 12:47 PM
Q: Two idocs will process from SAP to SAP via SAP-PI 7.1o and generated together.
Requirement :
Sync
2 IDOCs – as we explained our design will require two IDOCs. The first IDOC will be developed by a Z code and the second IDOC is generated by 100% Standard SAP BAPIs and 2 IDOCs send them to PI. Both IDOCs will be generated together by process code in sap and must be moved to PI and later to the receiver client together(SAP). The process can only be 100% completed when both IDOCs will be processed with success in the receiver side. Any one of the IDOC among 2 idoc's failed all the process should stop.
i think that is not possible , PI will not be able to stop successfull IDOC If another IDOC get fails .
Please give me approaches if any chance .
Thanks, Sanakr
HI Sankar,
Please explain the process flow.
Some questions:
How will the IDocs be triggered together?
Will they be scheduled by batch job ?
Are you required to merge the IDocs in PI?
What is the target format?
Cheers,
Ambrish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bhavani,
You can use BPM with correlation to achieve this scenario:
SAPTechnical.COM - BPM Scenario using Fork and correlation
Regards,
Suman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sankar,
your requirement can be achieve in PI with BPM.
regards,
Harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.