cancel
Showing results for 
Search instead for 
Did you mean: 

Idoc Scenario from SAP to SAP via PI 7.1o

Former Member
0 Kudos

Q: Two idocs will process from SAP to SAP via SAP-PI 7.1o and generated together.

Requirement :

Sync
2 IDOCs – as we explained our design will require two IDOCs. The first IDOC will be developed by a Z code and the second IDOC is generated by 100% Standard SAP BAPIs and 2 IDOCs  send them to PI. Both IDOCs will be generated together by  process code in sap and must be moved to PI and later to the receiver client together(SAP). The process can only be 100% completed when both IDOCs will be processed with success in the receiver side. Any one of the IDOC among 2 idoc's failed all the process should stop.

i think that is not possible , PI will not be able to stop successfull IDOC If another IDOC get fails .

Please give me approaches if any chance .

Thanks, Sanakr

Accepted Solutions (0)

Answers (3)

Answers (3)

ambrish_mishra
Active Contributor
0 Kudos

HI Sankar,

Please explain the process flow.

Some questions:

How will the IDocs be triggered together?

Will they be scheduled by batch job ?

Are you required to merge the IDocs in PI?

What is the target format?

Cheers,

Ambrish

suman_saha
Contributor
0 Kudos

Hi Bhavani,

You can use BPM with correlation to achieve this scenario:

SAPTechnical.COM - BPM Scenario using Fork and correlation

Regards,

Suman

Harish
Active Contributor
0 Kudos

Hi Sankar,

your requirement can be achieve in PI with BPM.

regards,

Harish

Former Member
0 Kudos

Hello Harish,

Could you pls provide me Links/documents ?

Thanks,