cancel
Showing results for 
Search instead for 
Did you mean: 

SAP MRS Assignment Issue!

Former Member
0 Kudos

Hi,
I have an Issue after upgrading to MRS 900.
I have an order created and the opertaions are having different Control Keys
Operation 10 - Control Key Z001
Opertioan 20 - Control Key ZFAC
Operation 30 - Control Key Z001

In the configuration i allowed Scheduling for operations only with Control Key Z001, it is perfect only the operation control Key Z001 is flown to MRS planning board. that is operation 10 and 30.
When i do the assignment in planning board for operation 10, the assignment remains after saving the planning board which is correct.

when i do the assignment for the operation 30 for the same or different resource, it gets assgined and when i save the planning board assignment disappears.
The problem is for the subsequent operations of the operation with Control key ZFAC.
So able to schedule 10 and unable to schedule 30.

Rgds

Sudhir

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi All,

          Any suggestions!

Former Member
0 Kudos

Hi,

  implement the Note - 2038445

Rgds,

Sudhir

Answers (0)