Hi all,
I've created a shifted capacity work center (1 person) and attributed to it a planning intervals:
As you see, this person is available during the first shift on Sunday (07.08.2014)
I've tried to see if SAP will check the availability of this work center in the IW31 menu by planifying a WO in a non availability time of this work center (interval 4PM - 8PM)
But SAP mention that capacities are available
Could SAP check the availablity of persons
(sorry for my English)
Hi Karim,
In the work center capacity you have mentiuoned time as 15 hr to 23 hr and in work center mentioned 16 to 20 .It matches. As capacity is available in the time .4pm to 8pm is available time only .Please check .
REgars
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anand,
That's why I'm talking about finite scheduling, the example that I've put in the start of this topic shows that:
- The technician is available by default from 3PM to 11PM (capacity)
- Specially, on the 07.09.14 (the last day of the inteval), the technician was declared available from 7AM to 3PM
In the work order, i've requested a job from 4PM to 8PM (normally the technician will not be available in this interval)
But as an output, SAP shows that the capacities are available (in this case, SAP refers to the default capacity and not the special interval..)
So i wonder to know how SAP could deep analyse the availability interval of every capacity (taking on consideration intervals)
@Kaushik: The 3rd screen capture shows "person responsible" that is different from the work center (MT-MED)..
Waiting for your reply guys !
Regards
Hi All, need Help !
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Karim,
System wont work according to the way you have defined your shifts because order header works with standard available capacity from maintenance work center and what you have defined does not comes under standard available capacity instead it comes under normal available capacity or pooled capacity. You can refer this hread ( Below) to get the details of pooled capacity or reach out to your Production Consultant for this.
Ill revert if I get something worth sharing.
Hope this helps
Rgds
Kaushik