on 09-02-2014 11:50 AM
Hi,
SAP would initiate a purchase requisition for a material item that had a MRP type of “PD”. This wouldhappen when the item was put on reserve against a work order by the maintenance or instrument/electrical folks. The material type was ZMR0.
Is it possible in SAP? How? can some body give tips for this scenario?
With Regards,
Hello Jaheer
After a reservation from a PM order is created and there is not enough stock, a purchase requisition can be generated by MRP to cover the requirement.
You may manually run MRP for this material on transaction MD03 or schedule a background job to be executed and plan all the materials of a plant using transaction MDBT.
Just make sure that the value 1 is set for the parameter "create purchase requisition" of your job variant or in MD03.
BR
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.