Hi All,

I want to schedule periodic RAR user level job in GRC 5.3 on weekly basis I want it to run the report on each Friday.

Please let me know the steps for the same.

When i click on periodic schedule  and choose weekly then for Friday what value i need to be fill in  the tab for running my report on each Friday.

Also I want my job to be start at 5:30 pm on each Friday so for this also if i choose the time in the above tab will it work for me.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

To set up the job,

Set it up as a delayed start (as you have done) and select the first date you want to run it on as the first Friday you intend it to run.

Then ensure the time is set and then set it schedule to run Weekly. Keep the "1" in the option, i.e. translates to "Every 1 week" and ensure your end date is set up as a long date if you want the job to run "forever" every friday after 5:30pm.

Once done, press "Schedule" and your job should run fine.

Hope that helps.