cancel
Showing results for 
Search instead for 
Did you mean: 

Source System(Logical system) issue

Former Member
0 Kudos

Hi All,

Recently we have done QA refresh & copied with production data.

For 0vendor master data we are extracting data from ECC source system. When I was trying to execute the DTP it is pointing older source system. We tried to create new DTP but when I'm executing still it is showing older system.

By using RSBKDTP_BDLS  program I forcefully tried to convert old source system to new source system but we are unable to solve this issue.

Here I'm attaching the issue .Please help on this issue.

Best Regards,

Sammar.K

Accepted Solutions (1)

Accepted Solutions (1)

RamanKorrapati
Active Contributor
0 Kudos

Hi,

Assuming as your facing this problem at BWQ.

So at BWQ please check table - RSLOGSYSMAP,

above table need to have the entries of ECC quality server as source and BW Quality server name as target system.

if not then ask basis team and maintain it.

later you can run your dtp.

Thanks

Former Member
0 Kudos

Hi Ram,

Thank you for our reply!

I'm having authorization to change RSLOGSYSMAP.

I passed source & target system when i execute the code it is saying no table entries found for specify key.

Best Regards,

Sammar.K

RamanKorrapati
Active Contributor
0 Kudos

Which t code you executed?

First check table entries. if you see any prod server names, delete them.

Later you can maintain required server names as per first reply.

Former Member
0 Kudos

Hi Ram,

I have compared Production & QA system entry's in RSLOGSYSMAP Table.

in prd system

source       target

qa6            prb01

in qa system

source       target

qa6             qa6

we found in qa it is pointing wrong target.

Regards,

Sammar.K

RamanKorrapati
Active Contributor
0 Kudos

You need to chage that wrong entry.

Take basis team help and correct it

Answers (2)

Answers (2)

former_member200384
Participant
0 Kudos

Hi,

When system copy is done from production data to QA .The BASIS Team has to run BDLS conversion.

Without BDLS run we can see everything will be like production in QA also.This will raise many issues regarding all objects,RFC connections etc.

In QA System ,BDLS run will change the all BW objects,source,targets names etc as per our previous QA system.

Thanks.

former_member976
Active Contributor
0 Kudos

Hi,

please chec the table RSLOGSYSMAP

take the basis team help system mapping above table.

Thanks,

Phani.