on 09-16-2014 2:25 PM
Hello Everyone
I am new to SAP REFX i am testing scenario in which need help. I m doing periodic billing/Monthly Billing for rent in which i have a building and i collect Utility Bills from my Tenants electric and flat maintenance charges that change every month now how to do periodic billing with changing values.
Below are the scenario.
Billing for 01.07.2014:
Basic Rent = 1000$
Electric Bills = 680$
Management cost= 300$
Billing for 01.08.2014:
Basic Rent = 1000$
Electric Bills = 750$
Management cost= 300$
Billing for 01.09.2014:
Basic Rent = 1000$
Electric Bills = 700$
Management cost= 350$
Need to capture Variable values or change values while doing periodic billing in Contract please suggest what to do. Which contract do i have to select.
Thanks
AAR
Hi AAR,
Based on your requirement you need to adopt the SERVICE CHARGE SETTLEMENT process which may solves your purpose.
The below links may help you to have a basic understanding on SERVICE CHARGE SETTLEMENT process.
http://help.sap.com/saphelp_470/helpdata/en/b3/1a393cc2b06a58e10000000a114084/content.htm
Config Manual with clarifications :
Hope it may helps you to get an idea on the same.
Regards,
Subbarao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Subbarao
Can you please guide me further i have done all the configurations and now i have selected
Contract: Residential Lease-out
Rental Unit: RO 1000/999/15
Differing Measurement: UO03(Electric Consumption) amount(150 KWH)
Conditions: Basic
Rent(Object Measurement) Value 6,500000
Operat.costs.pmt(Resid./Usable Space in M2) Value 2,000000
Adjustment tab: Free Adjustment defined in contract
Adjustment Condition: I have assigned Operat.costs.pmt in Absolute unit Price same 150
Now when i am running Flow type it shows sames values month-wise
Basic rent | 01.06.2014 | 520,00 | |
Operat.costs adv.pmt | 01.06.2014 | 160,00 | |
Basic rent | 01.07.2014 | 520,00 | |
Operat.costs adv.pmt | 01.07.2014 | 160,00 |
Although it should be like this
Basic rent | 01.06.2014 | 520,00 | |
Operat.costs adv.pmt | 01.06.2014 | 150 | |
In my Flow type how will i see the different value which i need to change. Please Suggest
Dear AAR,
The standard process is as below.
In Rental object you can find a tab called "METER" in that you need to assign a meter, by adding the charactaristic, then system will generate a meter number for that.
For the same meter number
Create Measuring Point (Meters ) using IK01
Create the charactaristics - Ct04
Create Measuring list (IK31)
Enter the consumption entry through (IK34)
The above standard t codes are available in Plant Maintenance for input the meter and transaction details.
Then to link those readings to our REFX contract i did not find the link in std system.
As per the process by using transaction " RESCSE - Execute Settlement " we will post it, but i did not find any accounting entries posting here.
But i understand that through custom development (ABAP) at back end, to make the interface between PM& REFX for loading measuring points details in contract .This process involve ABAP work also.
I hope this may helps you.If you need any more help/ documents on the above process mail me at below id.
Regards,
Subbarao
Dear AAR,
I have suggested to proceed furthur based on the required process for using service charge settlement.
To devpolop a Z solution you need think on the process how you would like to bring the vaiable data to RE contract periodically from PM module tables/ RE tables.
Try to discuss with your ABAPER as well as PM consultant to take it furthur, as its a joint effort between the both modules.
Regards,
Subbarao
User | Count |
---|---|
6 | |
5 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.