KPSI Plan Reconcilation do not update plan Activity

Former Member
0 Kudos

Hi ALL

I ran KSPP and I had scheduled activity. Now I want to transfer scheduled activity to plan activity. I ran KPSI, system generate plan documents. However when I check with KP26, plan activity did not change.

Thanks.

KPSI

Check with KP27

Accepted Solutions (0)

Answers (1)

Answers (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

In below thread, detailed steps are given by Mr. Ajay Maheshwari. Kindly check that all the steps you have taken.

Regards

Rajneesh

Former Member
0 Kudos

Hi Rajneesh Saxena

I stuck at Plan reconciliation step. I ran KSPP successfully. The guideline from Mr. Ajay Maheshwari do not help to solve my issue.

Thanks

rajneesh_saxena
Active Contributor
0 Kudos

Hi

In test server create same scenario and do the further steps (KP06-->KSPI) also and then check how system is behaving?

i have never used LTP hence not sure about.

Regards

Rajneesh

Former Member
0 Kudos

Hi,

I knew the reason. This is a bug, and I had to apply a SAP Notes to fix this issue.

Thanks