on 09-18-2014 1:12 PM
Hi MDG Gurus,
We are implementing MDG-S on MDG 7.0 on SAP ECC 6.0 ehp6 for a client in a co-deployed scenario.
Actually I have a small confusion in designing the workflow for this:
1) Can we only use a rule-based workflow for MDG supplier workflow configuration like we use for MDG-Material ? If yes, then after the activation of BC-set "CA-MDG-APP-SUP_DE_VC_USMD110_C" can we ensure that the BRF+ decision table steps will be imported successfully or do we need to perform some other configuration?
2) But, If we use the conventional method as given in the link Set Up the Workflow - Master Data Governance for Supplier - SAP Library,
then can we achieve success in the successful configuration of the workflow OR do we need to use both the methods as given in the guide.
Please let me know which is the preferred method which we can use for configuration of supplier workflow and please provide some document having screenshots or step by step guide to configure the Supplier workflow using these 2 methods.
Thank you.
Regards,
Satyam
Hi Satyam
Wheras in rule based workflow which is flexible for this we can add additional reviewer also. So it is our call to fit all business requirement and use best suitable option for thses.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sanjay,
Thanks for your valuable inputs.
Can you please let me know that If I go ahead and configure Rule based Workflow for Supplier, then which BADI I need to configure and how.
Also, For my understanding, if I activate the BC set 'CA-MDG-APP-SUP_DE_VC_USMD110_C' then can I ensure that all the decision tables data pre delivered by SAP will be imported into my client?
Do you have any step by step guide having screenshots which contains all the steps for rule based workflow configuration for Supplier as it would be easier to understand.
Thanks in advance.
Regards,
Satyam
Hi Satyam,
If you want to edit the rule-based workflow, we have a BADI named as "Context-Prepare for rule based workflow". By using this you can edit the decision table and create your own custom items(columns) in the decision tables.and you can assign the workflow template to your change request type.
like:-
SUPPL01----- WS60800086(rule-based workflow template).
for checking the decision table for supplier, once you go to Configure rule-based workflow setting, you have to select the object for supplier, like what we select for material(i.e. MAT01, MAT02, etc)
Thanks!!
Regards
Prateek Agarwal
Hi Sanjay,
The docs which you shared are related to the customization of BRF+ tables for new CR types.
Do you have the docs having the step by step guide for Rule Based Workflow configuration for MDG-Supplier with screenshots?
It would be very helpful for me if you share it.
Also, please validate if the provided link is sufficient for configuring the workflow using standard templates w/o using rule-based workflow for MDG-S or any extra configuration is required for MDG 7.0 version?
Any inputs will be very helpful for me.
Regards,
Satyam
Hi Sanjay,
You've mentioned functional areas like general, company or purchase data with possible different reviews/approvals.
What i'm looking for is to be able to create parallel request e.g. there's pending request on change to Company Code1 data - this should not stop user from requesting change to Company Code2 or to general data.
Would you be able to guide me how to achive this - wasn't able to find documentation.
Regards
Andrzej