on 09-18-2014 2:10 PM
Hi,
I have a problem with transaction MC1B and the costcenter which is allocated to the materials.
If I now do a posting with MC1B for 2 different materials they all come on the same costelement and costcenter. I want to have a different costcenter for each material. What do I have to do
Thanks
Hi,
In Material Master -Profit Center will assigned...
In OKB9- Against PC we can assign Cost Center ...
If You can issue Cost Center -no issue...
If your Material belongs to same profit center- if you want to post to Different Cost Center not possible - need to go for Validation/Substitution
or
Need to create Separate Account modifier..
Regd,
Khan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Khan,
Ok. My 2 material have different profitcenter in master data.
Does this mean that if i put in OKB9
Costelement A with profitcenter of material A and put costcenter A and
Costelement A with profitcenter of material B and put costcenter B this would solve my issue?
This means we have 2 times costelement with different PC and CC in OKB9?
Hi,
You can define the account assignment for cost element only one time. Define cost element with company code in OKB9 and select the option '3' in account assignment details. After that select the row and select detail per profit centre. Here you have to input the below values.
PC Cost centre
A A
B B
Regards,
Mukthar
Hi Stijn,
It seems that your case Cost Centre assignment cvomes from OKB9.
If the two materials are assigned to different Profit Centres in material master you can assign in OKB9 different CCs based on Profit Centres.
Regards,
Szymon
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.