on 09-18-2014 5:42 PM
Hi,
When the user starts a campaign and schedules the job to a period in the future, is there any option for the user to check the time which was scheduled, from the campaign overview page?
I know that you can see it on SM37 (jobs), but I wonder if that information is available at any place on the campaign itself.
Thanks.
Hi Susana,
I am not sure if it can be viewed from campaign itself. But, you can enable a logical link 'Batch jobs' in any of the work center and from there it can be viewed, this means without visiting GUI.
Rgds
Hari
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As hari mentioned only option in the UI to view the campaign execution job is by enabling the logical link batch jobs, are by doing an custom UI development. By bringing the Batch jobs assignment block in to the campaign and show the status of campaign job details.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.