cancel
Showing results for 
Search instead for 
Did you mean: 

Campaign execution job

Former Member
0 Kudos

Hi,

When the user starts a campaign and schedules the job to a period in the future, is there any option for the user to check the time which was scheduled, from the campaign overview page?

I know that you can see it on SM37 (jobs), but I wonder if that information is available at any place on the campaign itself.

Thanks.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Susana,

I am not sure if it can be viewed from campaign itself. But, you can enable a logical link 'Batch jobs' in any of the work center and from there it can be viewed, this means without visiting GUI.

Rgds

Hari

Answers (1)

Answers (1)

former_member191572
Contributor
0 Kudos

Hi,

As hari mentioned only option in the UI to view  the campaign execution job is by enabling the logical link batch jobs, are by doing an custom UI development. By bringing the Batch jobs assignment block in to the campaign and show the status of  campaign job details.