on 09-19-2014 4:49 PM
When we change a maintenance package on an existing maintenance plan to a package whose frequency is not an exact multiple of the previous package (for example, changing from a 6M 180-day package to a 1Y 365-day package) and then restart the plan, the call horizon of the plan seems to be ignored and the new call dates are always a day or so before the plan date regardles
Why is the call horizon being ignored in this situation?
David,
SAP do not recommend mixing UoMs within the same strategy (e.g. Months and Days) as this can cause scheduling inconsistencies.
You would be better off having two strategies, one based on Months, and one based on Days.
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
Please check the Option Start in Cycle while scheduling the Plan.
Also refer the below thread too
http://scn.sap.com/thread/1788240
Br
Rakesh
Message was edited by: RAKESH MANE
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.