cancel
Showing results for 
Search instead for 
Did you mean: 

Master Recipe - Operation Scrap

Former Member
0 Kudos

Hello,

We use master recipes. We are trying to maintain scrap% value for an operation/phase, and I don't this field on the screens.

Any thoughts? Is there a way to maintain scrap at operation level if we use Recipe?

I tried OP5D and I see that Scrap field is already listed as an Input field.

Accepted Solutions (0)

Answers (1)

Answers (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

There is no operation scrap for master recipe and the phase scrap cannot be directly entered into the recipe like it is in the routings.

You can use material quantity calculation to calculate any loss during the phases.

Best regards

Caetano Almeida