09-19-2014 7:18 PM
Hi,
Following error occured during FMBBC posting, in FMBBC screen I don't have budget type shown in the below error, but why system is giving this error which leads not able to save document
Budget type XXXX does not exist for FM area XXXX, for Budget
Message no. FMCU008
Diagnosis
You want to use budget type XXXX in FM area XXXX with Budget. However,
this budget type is not defined for this FM area.
Procedure
If you want to use budget type XXXX in your FM area, maintain the
settings in Customizing or choose another budget type.
Procedure for System Administration
If you want to change the Customizing settings, select the Customizing
pushbutton.
Regards
Upendar
09-19-2014 7:58 PM
Hi ,
FMBB is not designed for statistical budget. You have 2 tools to generate statistical budget:
1. Transaction FMPEP:
Multiple Budget Entry. Using this tool you can create single budget document using the statistical budget S1 (like FMBB)
Before using FMPEP you have to create a layout in the customizing. See Budget Entry Documents-> Document Definition -> Define Layout for Multiple Budget Entry. There you define budget type xxxx (it is available in F4 help, I checked in your system).
2. Transaction FMMPSTAT (program RFFMMP_STAT)
Using this transaction you can generate statistical budget documents calculated by a Key Figure and a source budget (you must already have budget on the database).
You should be allowed to use the value type xxxx statistical but for that you should be sure to define 2 things:
a) document type with the scenario for Value Type "statistical" in the IMG activity:
Budget Control System (BCS) -> Budgeting- > Budget Entry -> Budget Entry Documents -> Document Definition ->Define Document Types
b) Control Budgeting Flow -> Edit Status => you should set a status for the budget category / budgeting process / budget type to be used.
Then you will be able to use the Value Type xxxx in FMBB.
Regards,
Hugo