on 09-29-2014 1:38 PM
Message no. 9J539
Stock exists in activity type ER. However, you cannot use this stock to cover your requirement, because activity type ER cannot be used in the removal sequence.
Check whether the removal sequence is correct and add activity type ER, if necessary.
Pls help me with this error msg.
Please check your below configuration setting:
Logistics - General --> Equipment and Tools Management (ETM) --> Operations and Functions --> Document Categories --> Maintain Removal Sequence Depending on Activity Type --> Maintain Material Removal Sequence Dep. on Activity Type
Chin2.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Can you help me with the column names(and screenshots if possible) of the entries you have mentioned above as I am not having ETM activated here at client side hence it is hard for me to check in system right now.
Chin2.
Hi,
I'm cancelling the shipping document creation for one of the equipment. And end user entered the wrong recipient during the process. So equipment stocked into wrong recipient. So after your reply i understood that it will not be possible for to cancel the shipping document due to sequence maintained in config.
Thanks
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.