Please help me fix following error
I want to transfer planning data from SOP to COPA. When I do transfer, I got message :
The characteristic "PRCTR" ("Profit Center") should be posted to Profitability Analysis (CO-PA). When the system checked the entries, it was established that the transferred characteristic value (" 1000 6200") is not valid in CO-PA.
I knew 1000 is Controlling Area and 6200 is Profit Center. But I do not know why system post 2 value to one Profit Center characteristic
I planned planning data in S991 (Plant, SOrg, DC, SOff, Material and Customer). I checked with SE16n and I saw my data
I maintained following steps :
- COPA Profile, MC7P
S991 version A00 , COPA Version 0. Record Type F, Plan indicator 1
- Characteristic assignment
+ S991-WERKS --> COPA - WERKS
+ S991-VKORG --> COPA - VKORG
+ S991-VTWEG --> COPA - VTWEG
+ S991-VKBUR --> COPA - KMVKBU
+ S991-MATNR --> COPA - ARTNR
+ S991-PKUNAG --> COPA-KNDNR
- Key figure Assignment
+ S991-FKIMG --> COPA-ABSMG
- Key for planning Activity
Assign COPA Profile to Assignment. and Plan indicator = 1
Thanks.
Hi Quang Dao,
Please have a look at SAP Note
Please make sure that derivation date defined for your plan version in transaction OKEQN
is within validity dates of your Profit Centre.
Regards,
Szymon
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.