on 10-08-2014 5:45 PM
Hi,
We're running CPS Redwood M33.74-62951.
We're sometimes encountering the following problem : jobs are getting completed in SAP ECC by still running in CPS.
Yesterday a job ran 70 sec in SAP and get completed after 90 min in CPS.
Could someone figure out where the problem is lying ?
Regards.
Clement M.
Hi,
Its a simple issue .Please check once your mount point .i mean where exactly job logs writing.Please check once and try.
Thanks
Muralidhar Reddy K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Probably it's an SAP issues. Please check the below thing:
1. Check the RFC connection logs and gateways logs.
2. If this issues is due to some connection/ CPIP issues (Mostly) - System logs(Sm21) (or ABAP dump (St22)) s/b be generated for that time period- log related communication error/OS related error.
3. Check the trace for process server in Redwood (it's contain everything but not the best way analyzes the issues)
or Use transaction RZ15 to inspect the log in Sap.
There s/b some core dumb generated in period of 90 mins. It's happened mostly for my Non Production system, i never have looked up but found those issues in dump.
Regards,
Abhishek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.