on 10-16-2014 6:12 PM
Hi experts.
I'd like to update a Netweaver 7.0 EP 1 system into a Netweaver 7.3 EP 1, but the system has some addons installed for recruiting.
SAP_BS_FND
WEBCUIF
BI_CONT
ERECRUIT
I would also like to turn this NW into a ECC, is this posible?
What would be the best approach?
should i upgrade the sistem to a NW 7.3 EP 1 and then turn it into an ECC?
should i turn it into an ECC and then upgrade?
I'm starting as a Basis, so maybe i'm making some mistakes in defining the procedures, so please correct me if so.
Thank you very much
Hi
SAP application architecture does not allow that kind of operation.
Even if NW is the technical base for ECC there are no ways to upgrade/promote a NW system to an ECC.
PS: post this kind of message in NW related forum you ill get more answers
http://scn.sap.com/community/netweaver-as
These link wills hep you finding your way
Find Topic Spaces on SCN (Forums)
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.