Operative indicators disappearing

Former Member
0 Kudos

HI gurus,

when i am create project in Tcode CJ20N operative indicators not appearing.

please suggest.......

Accepted Solutions (0)

Answers (3)

Answers (3)

sushrut_sheth
Active Participant
0 Kudos

Hi,

Please check the following details and confirm

is there any layout saved for particular project profile if yes then the same project profile is used for both projects.

in this case check the user settings (layout custom settings)

other case is different profiles are been used for project and for one profile custom settings might be applied

also check as above.

if all this is fine then please raise it to SAP ,with your conditions and scenarios

sanjeevc
Active Contributor
0 Kudos

PRPS-FAKKZ this field should be as input in OPUK transaction.

Regards,

Sanjeev

varshal_kachole3
Active Contributor
0 Kudos

Hi,

Please check Configuration in Transaction OPUK.

Hope it helps!

Thanks and Regards,

Varshal Kachole

Former Member
0 Kudos

Hi Varshal,

these two projects are investment projects, One project i am getting and another project i am not getting operative indicators.......

varshal_kachole3
Active Contributor
0 Kudos

Hi,

Double click on each Operative indicator in OPUK and see the influencing field.

e.g. Project Type, Project Profile,Profit Center etc.

Hope it helps!

Thanks and Regards,

Varshal Kachole

0 Kudos

Hi,

Are these projects created with same project profile ????

Regards.

Former Member
0 Kudos

Hi Siddu,

Check if both projects are using same project profile...

If yes, then compare each field maintained in the project for both projects.

If not, then you may need to check if following fields are not set to Hidden

Planning element  (PRPS-PLAKZ)

Acct asst elem.    (PRPS-BELKZ)

Billing element      (PRPS-FAKKZ)

Regards

Tushar

Former Member
0 Kudos

Hi Tushar,

i agree with above answer, but Field selection for wbs is though out PS controls, so how is it possible to control the project profile....

Former Member
0 Kudos

Hi Tushar,

i agree with above answer,Project Profiles are different. But Field selection for wbs is though out PS controls, so how is it possible to control the project profile....

varshal_kachole3
Active Contributor
0 Kudos

Hi,

while in OPUK select the Screen group: WBS Element.

  • Screen print by Pressing F7.
  • Please double click on

Acct asst elem.:PRPS-BELKZ

Billing element  :PRPS-FAKKZ

Planning element : PRPS-PLAKZ one at a time.

Take Screen print of each case and send back here.

Thanks and Regards,

Varshal Kachole