cancel
Showing results for 
Search instead for 
Did you mean: 

Getting message "Availbility Control" BP622 while doing credit memo against a PO

Former Member
0 Kudos

Hi,

For a PO, which is assigned to a WBS element, while doing Credit Memo, user gets the error, "Availability COntrol" message number is BP622 .

Please let me know, why this message appears and how to correct the same.

Regards

SR

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello Swastik,

Have you tried search forum first with the error message what you are getting?

If not, please do that.... You will find lot of threads already discussed in this forum for this topic.

Regards

Tushar

sammar81
Employee
Employee
0 Kudos

Hi Swastik,

In CJ30 or CJ31 check for the available budget for the WBS against which this message is being raised.

hope it helps

Regards

Sammar.