on 10-21-2014 9:46 AM
Hi Experts,
I am creating order manually in IW31, and for component with item category N I am updating 100 inr as cost. But in cost TAB I can see cost appearing as 200 inr.
After analysis I found 100 inr cost is appearing operation line item (external) TAB, therefore in Cost TAB its 200 inr.
Any idea why its populating 100 inr in operation TAB as well?
Thanks
DM
Hi Deepak,
Please check the following
1. Can you check whether there is any external operation with INR 100 is assigned ? (Manually added)
2. For any operation is there a cost is maintained in external tab ( Manually added)
3. KP26 maintained for cost center / activity but this will not be displayed in the external tab (Cost calculated automatically)
When you go to costing tab, what is the group this cost was displayed ?
Regards
Terence
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
DM,
Can you send a screen-shot of the External tab data, and also the Cost tab
PeteA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
Please provide the screen shot of sub Tab "Quantities" of overview cost Tab
Additionally you maintain the Price as INR 16 per Piece in first screen shot and and your requirement quantity is 2 which is shown in third screen shot that's why cost coming as INR 32 in planned cost.
Br
Rakesh
Message was edited by: RAKESH MANE
Deepak,
The costs are being generated as follows:
You need to remove the cost in the External tab (1st image).
To do this you may need to change the Operation Control Key from SM02 to SM01 (assuming standard settings).
PeteA
Hi Pete,
I have not entered the cost in external operation. it is appearing be default.
we are entering cost only in component purchasing data - snapshot 2 i.e. 2*8 = 16.
Now, issue is - this cost is getting defaulted / copied in operation external TAB. which is making the overall cost of the service order as 32 inr. That's an issue.
Thanks
DM
Hey Deepak,
most probable reason is the one described by Rakesh.
Another reason could be that you have chosen the operation quantity (AFVGD-LOSVG) of 2 in tab "External" of Operation and therefore the price is doubled.
Regards,
P.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
That additional cost might from labor cost which is calculated on the basis of KP26 Transaction (hourly rates maintain by Combination of cost center and activity type of work center)
Br
Rakesh
Message was edited by: RAKESH MANE
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.