on 10-21-2014 5:18 PM
Hi All,
I have multiple activity types for labor. I have one cost center- maintenance. Now I can plan for multiple combination of activity types with same cost center and arrive at per hour rate separately per activity type.
But I post the actual cost to only one GL(wages account) and the cost center- 'maintenance'.
Now my planned rate for act type A for maintenance is 10/ HR and act type B for maintenance is 20/HR.
Now assume the actual number of hours confirmed for both is 10 hours and the actual amount posted to wages account is 150. Now the system will arrive at actual per hour rate as 15/Hr. While my planned costs are 10 and 20 per hour since they are skilled and unskilled labors.
And I cannot post the wages to two different accounts.
Please tell me how to handle this, since the actual per hour rate calculated is not proper
Hi Satan
There are 2 ways, I prefer the 1st one
1. Have separate GL accounts for both.
2. Have different UoMs for both act types, say, HR and EA
In Splitting structure (OKES), you can specify a weighing factor of 2:1 for HR : EA
This will split the 150 as 100 and 50 instead of 75 and 75 and you will be act rates as you want
Br, Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I think Big Choi's solution is the right one.
But for completeness I'd like to present one more option.
In txn. OKKP tick field "AA: Activity Type".
With this setting you can assign actual payroll costs directly to cost centre/activity type. So no splitting is necessary.
Below is SAP doco for this setting:
"
Controls whether the activity type can be used as an account assignment object for actual postings.
If this indicator is selected, actual primary costs can be assigned directly to the activity type of a cost center.
You can use an activity type as an account assignment object in the following application areas:
Regards,
Szymon
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.