on 10-22-2014 12:00 PM
Hi Friends,
We stage component for production using wm pp interface.
We have z tcode wherein we call wm pp interface. If we stage 10 component for the production order & confirm the staging TO.
If we scrap the material in production line for qty 2. Again if I go to stage 2 qty scrapped for the production order with same Z code it should create TR & TO for qty 2. But TR now is getting created with 10 Qty. After debugging we got to know that qty RESB-BDMNG is being used to create transfer requirement which is 10 qty.
My question is as I have staged 10 qty for the production order as per the requirement & confirmed TO. Why this RESB BDMNG is still showing qty 10. This is causing issue as I want to stage 10 qty for production order but we are staging 20 qty ( 2 qty scrapped.)
Thanks,
Kiran
Since it is a custom transaction designed specific to your need & requirement, I am afraid that SCN team member won't be able to provide much support as we are not aware about the requirement detail and logic on which it was designed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
BDMNG is not changed as it is the only source of information that can tell you at any time in the future what the original required quantity was.
There is a second field ENMNG which has the withdrawn quantity. Further you have indicators, e.g. KZEAR for final issue and XLOEK deletion indicator which need to be considered to know how much is still open.
Hi
Which staging indicator you are using for staging material?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.