Transfer of Requirements for Consignment Pick Up

Former Member
0 Kudos

Dear Experts

We are using the standard SAP Consignment Pick Up. However when creating the sales order the transfer of requirements is not happening (not shown in MD04). I would like the pickup order to be considered as a "planned receipt". This would then be taken into consideration during ATP. Any ideas?

Accepted Solutions (1)

Accepted Solutions (1)

srinu_s1
Active Contributor
0 Kudos

Check what is the schedule line category in your case?

F1- cons Pickup w. ACh - will transfer the requirements and shown in MD04.

F0- ConsPickup w/o AvCh - will not transfer requirements and not shown in Md04. reason is  the below two fieds are NOT checked.

1. Req/Assembly

2. Availability check

Also refer the very useful document if the above settings are correct.

thanks,

Srinu.

Former Member
0 Kudos

Hi Srinu

Thanks for the reply. We are determining shedule line F1 and still no transfer of requirements occurs.

srinu_s1
Active Contributor
0 Kudos

If that is the case please follow the above mentioned document am sure you can find the exact issue.

Former Member
0 Kudos

Thank you for the help. We came to the conclusion that the consignment pickup cannot generate a positive+ requirement in MD04.

Answers (2)

Answers (2)

adithya_velide
Participant
0 Kudos

for this pickup order no need of TOR. Cause stock will not be for outbound deliveries.

adithya

adithya_velide
Participant
0 Kudos

Hi paulo.

       while you create consignment pickup order system will check the availability of the remaining consignment stock. And that remaining stock will be automatically taken into the consideration. And it will be shown in mb1c clearly. That remaining stock will be considered for pickup order. By F1 schedule line Category. Movement type 634. Stock will be reduced from consignment stock and will be added to unrestricted stock.

might helps,

regards,

adithya