Required start date and required end date in PM notification

Former Member
0 Kudos

We have Maintanance plan:

Priority 1-Very high


Setting of priority:

When the cycle is exceeded, system generate PM notification. For example thy cycle is exceeded on 23.10.2014 system generate this notification with these Start/End dates.:

I can´t understand, how system generate require End date! Could someone explain to me? Where can be problem?

Thanks

Lukas

Accepted Solutions (0)

Answers (2)

Answers (2)

MTerence
Active Contributor
0 Kudos

Hi Lukas,

I guess there is some bug in the system, check whether this note is applicable.

2074571 - Incorrect priority in EAM notification when it is produced from a maintenance plan (call o...


Regards

Terence

Former Member
0 Kudos

Hi Terence,


thanks for your advice. I think that, it could be solution of the problem, but I can´t implement this note, becouse this note is intended for different software component (we have SAP_APPL release 500, level 0016).


Lukas

MTerence
Active Contributor
0 Kudos

Hi Lukas,

If you get this error for all the maintenance plan and you are able to replicate the issue, then you can raise a OSS note to SAP, they might give you some for the same.

There are some more notes available 754375 & 843634 , check these notes

Regards

Terence



Former Member
0 Kudos

Hi Terence,

I looked at notes, that you recommended to me. Note 754375 is part of support package  SAPKH50003 and note 843634 is part of support package SAPKH50009. We have instaled support package SAPKH50016.

Problem exists still...

Lukas

MTerence
Active Contributor
0 Kudos

Hi Lukas,

Best way is raising a OSS note to SAP.

Regards

Terence

marianoc
Active Contributor
0 Kudos

Hi Lukas,

This is not the right space for your question, this is not PP is PM.

I would move this thread to  SAP EAM space:

This way you will get assistance.

Kind Regards,

Mariano