cancel
Showing results for 
Search instead for 
Did you mean: 

Batch Creation

Former Member
0 Kudos

Hello,

I created a new batch using MB1A transaction, then checked the batch created in MSC3N there Last goods Receipt date was not filled.

anybody know why it was not filled ? thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Prasoon
Active Contributor
0 Kudos

Hi,

   The last goods receipt date in the batch master will be filled once you post the Goods Receipt for a purchase order or a production order.

   You may create a PO for the material and post the GR against the PO and then check the field.

Regards,

AKPT

Former Member
0 Kudos

The Mvt type I am using won't allow to adopt a PO.

Is there any way that we can add last GR date to the batch through MB1A ? since this is the requirement.

JL23
Active Contributor
0 Kudos

You are talking circles, this was already answered, a goods issue (MB1A)  cannot create a GR date, like you cannot dry your face with water.

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

Are you sure you created a batch with a goods issue posting?

If that is the case, then it is obvious that that you have no GR date  yet.

Former Member
0 Kudos

Then how does the batch can have the last GR date ?

was it not possible when created through MB1A ?

JL23
Active Contributor
0 Kudos

If you start your process with a goods issue instead of a goods receipt then you can just have a "last goods issue date" . How do you expect a Last goods receipt date if you did not do a goods receipt?

Former Member
0 Kudos

Even MB1C does not populate the last GR date.

Could you please provide the steps on how to get the last GR date on the batch ?