on 10-27-2014 12:03 PM
Hi,
Can anyone tell me what is the SAP BG job for scheduling the Archive log directly move it into the disk.
Because our DB is filled up with archive log mostly not like normal.
DB: Oracle
OS : Windows
What will be the issue its day by day filling highly.
Or else please suggest some different Idea.
nethaji
Hi Nethaji,
There is no way to move archive logs directly moved to disk in windows systems through sap bg job scheduling you have do it manually after checking the archive size.
in unix and solaris systems it can be done through some scripts or it can be done through cron jobs.
Thanks,
Abdul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.