cancel
Showing results for 
Search instead for 
Did you mean: 

Automatic valuation in record result QE51N

former_member216529
Participant
0 Kudos

One material has a quantitative  characteristic single result .

After I do QE51N result recording for one material , I  lock the Result recording manually,

,I want to lock it automatically after  I enter the RR.
How can do it ? Thank you!

Is it you mean the right answer is

I set the  valuation mode in sampling procedure

into other valuation mode  such as  700 Mean value within tolerance range?

Thank you!

**Moderator's Note:  Broken off from an older post.  Please do not reply to old postings.  You can insert a link to old posts that may be relevant to your question.  This question was broken off from this posting: 

**

Message was edited by: Craig S

Accepted Solutions (1)

Accepted Solutions (1)

former_member207800
Active Contributor
0 Kudos

Please set 'automatic close' for recording configuration in plant level. (IMG)

Also check the default user setting for result recording.

Regards

former_member207800
Active Contributor
0 Kudos

Now I can access my SAP system.

Check below.

SPRO > Quality Management > Basic Settings > Maintain Settings at Plant Level > Details

> 'Results recording' tab > recording configuration

I recommend 'automatic close' for your requirement.

If it doesn't work, please check the user's default setting on transaction QE01 (same as QE51N).

Regards

former_member216529
Participant
0 Kudos

Hi,Kim,

The SPRO -recording configuration is automatic close ,and the user setting is

You mean I active the Autom.save on confirmation of last value?

but I can't save the setting  after I  active it .Thank you!

Best regards!

                                          Mishuang Zhao

Answers (0)