on 10-28-2014 12:32 PM
Hi Experts
Need your insight on this strange issue.
Business case: Stock transfer between two storage location which are WM enabled.
We are using a movement type 921 to move the stock between two SLOC of same plant and same WH
After MB1B is executed in LT24 I see TO twice (see below) with same details only SLOC and item number is different.
My requirement is to create a TO in the system after MB1B is executed and then confirm this TO using an inbound idoc.
The movement type 921 has following configuration done.
OMLR config.
Kindly let me know how can I avoid duplicate TO creation in LT24.
Thanks in advance
It seems you are passing the information to the SUBSYSTEM. Can you please share more detail e.g which Inbound IDoc you are using to pass the information to Subsystem, receive confirmation back from subsystem to SAP for confirming the transfer order
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The Transfer order screen which u shared earlier is after confirmation of transfer order or after creation only ?
As per standard SAP once you perform the MB1B (PCN) system create two line item in the transfer order
1) From actual bin to 922 storage type
2) from 922 storage type to actual bin back
Could you please share the screen detail of MvT 921. Would like to see what is the source and destination storage type defined in that (LE ---WM----ACTIVITIES----TR---Define movement type)
As per standard SAP it is perfectly fine as mentioned earlier system create two line
First for Source to Intermediate from actual bin to intermediate (922 in your case 010) and
Second Step for Destination - from 922 (in your case 010) to actual bin.
In this case your WMTOCO should come back with Line item 2 and confirm the transfer order
If i will consider your subsystem then you need to send both the detail to Subsystem from where system is supposed to pick and where it is suppose to transfer.
Thanks Manish
for the clarification
But can you help me to understand why first item is getting confirmed automatically and second not?
I checked the idoc and I see that we are sending both the line item to external system, but the problem is the confirmation from external system is failing because the first item is alredy confirmed..
Any guess why is that so?
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.