cancel
Showing results for 
Search instead for 
Did you mean: 

Changing the formula used to calculate MICs in existing inspections

cristin_charbonneau
Participant
0 Kudos

Hi.

I have a task list in which there are calculated MICs.  Is there a way to change the formula being used to calculate the results and have it apply retroactively in inspection lots (assuming the ability to undo the usage decision to change results for lots with a usage decision)?

Thanks,

Cristin

Accepted Solutions (1)

Accepted Solutions (1)

former_member221025
Active Contributor
0 Kudos

Hi Cristin,

Once Status of Insp Lot changes from REL to INSP you can not reset sampel (Can not change task list assigned to an Insp. Lot).

So I believe you can not change Formula once Results are recorded, Its possible only until status of Insp lot is REL.

Amol.

Answers (0)