cancel
Showing results for 
Search instead for 
Did you mean: 

Component BP-ERP is in an undefined state

DieterLorenz
Active Participant
0 Kudos

Hello,

we wanted to install SPS on ERP ECC 6 EHP 7 on HANA with SUM Version SUM10SP11_3.

In the Downtime the SUM stops with the error message:

>> Waiting for request handler...

>> Received 'next' action for unit 'EXECUTE'.

*** FATAL ERROR: Progress bar level 0 overflow 92 + 1 > 84

Execute Report RSUPGRES

Start a fresh SUM, but get this error message:

Component BP-ERP is in an undefined state, Upgrade wasn't completed - maybe upgrade was not reset ?


How can I fix the issue ? A restore is not possible because SAP Support take 2 months working on this ticket.

Thanks a lot

Accepted Solutions (1)

Accepted Solutions (1)

DieterLorenz
Active Participant
0 Kudos

Start a fresh MOPZ and newest SUM. Clean table svers. Reset the upgrade via reports:

2053877 - Rücksetzen des Upgrades nach Notfällen

417670 - Ergänzungen zum Zurücksetzen des Upgrades ab Release 6.10

Now it works, but get another error

Thanks for your help !

Answers (1)

Answers (1)

former_member185239
Active Contributor
0 Kudos

Hi Dieter,

Delete the entries from UVERS table.

But before this reset the previous upgrade and then delete the entries from UVERS table.

With Regards

Ashutosh Chaturvedi

DieterLorenz
Active Participant
0 Kudos

Hi Ashutosh,

the UVERS table is empty. I think the Report RSUPGRES clean it up. If the UVERS table is empty I can start a fresh SUM again ?

Regards

former_member185239
Active Contributor
0 Kudos

Hi Dieter,

Yes you can.

With Regards

Ashutosh Chaturvedi