cancel
Showing results for 
Search instead for 
Did you mean: 

Core Times 1 and 2

Former Member
0 Kudos

Hello, for core times 1 and 2, how to determine if employees are at work during the period? Which specific data to check?

Br, Annry

Accepted Solutions (1)

Accepted Solutions (1)

venkateshorusu
Active Contributor
0 Kudos

As far i understand This can be determined by time type where it has to be configured in the table V_T555Z there you check with ID 3 and P type1 which time type has been assigned and that same time type will hold the core time attendance, absence etc details check it may work.

Regards

Venkatesh

Answers (1)

Answers (1)

Sanky
Active Contributor
0 Kudos

Hi,

If you are using positive time managment then go through the table T555Z of check with ID 3 and Ptype 1.

TIMTP function will read the data from this table with comparison of TIP entry with PSP table details.

Regards,

Sankarsan