cancel
Showing results for 
Search instead for 
Did you mean: 

extraction issue after System Refresh

former_member182537
Active Participant
0 Kudos

Hi Guru,

We recently had a production refresh for our BW as well as ECC system- so after the refresh Basis ran BDLS and performed required activity

to create RFC and now in BW RSA1 we have correct source system maintained.

Extraction for data load are also fine . Just there is issue for GL account master data load....

for GL Attribute master data - source system is not mapped to anything -in the transfer rules.( 0SOURCESYSTEM infoobject is derived via Transfer routine).

the data load for GL ATTRIBUTE master data is failing with error

"source system assignment failed for XXXX" where XXX is production ECC system - not sure why it is taking production system into account- data laod till PSA is fine - just during update to master data it fails.

Note- The load was successfull when i maintained source system ID for production in RSA1--->TOOLS-->aSSIGN SOURCE SYSTEM - but we dont want prodcution system to be part of GL master data - ideally we should be getting correct source system in our master data.

We checked that 0SOURCSYSTEM infobject has transfer routine from where source system is derived - so can you advise where could be the problem ? As this looks liek issue to refresh since other system have correct source system..

Any tables /t code that we can check- Basis is saying BDLS ran fine.

Thanks

Nilesh

Accepted Solutions (1)

Accepted Solutions (1)

former_member200384
Participant
0 Kudos

Hi,

BDLS conversion will make all the underlying Objects,Tables,Data flows etc point to our desired system which was there PreSystem Refresh.I guess running BDLS run in both ECC and BW will resolve the issue.

From BW side do replication of DS and Activate the Transfer rules and then pull the data.

Thanks,

former_member182537
Active Participant
0 Kudos

let me check and will update...

Running BDLS in ECC - any specfic steps to be followed from Basis side?

Answers (5)

Answers (5)

former_member200384
Participant
0 Kudos

Hi

The main purpose of BDLS run is to change Logical system name.After BDLS check RFC connection,Partner Profile and the most important the  table RSLOGSYSDEST.Here see the entries of Logsys and Destination fields.

Thanks,

former_member182537
Active Participant
0 Kudos

thanks Biplav - issue fixed by activating transfer rules

Former Member
0 Kudos

Hi Nilesh,

Please ensure that the BDLS in the target system has been run properly.

Also please check in SE16 whether the Logical System name entry has changed or not for the corresponding table.

RamanKorrapati
Active Contributor
0 Kudos

Hi,

At RSA1-->data source,

please see which source system is assigned to your data source.

Again replicate your gl attribute data source from Correct ecc and activate it.

later try load data form PSA to Info object.

Thanks

Former Member
0 Kudos

Dear

See all background jobs are rescheduled properly after system refresh bcaz when u do system refresh all background jobs of source system are getting updated

check BTCTRAN2 jobs run this report

Regards

former_member182537
Active Participant
0 Kudos

Not sure if this is of help as job is running without any issue and failing with error.

please let me know if any further question

can someone please list all activities that we need to do after system refresh of both ECC & BW

1. BDLS run By BASIS- here what specifically needs to be done.

2. Any activities from BW side after BDLS - please advise.

former_member182537
Active Participant
0 Kudos

any help please ?