on 11-05-2014 5:50 AM
Dear Gurus,
I tried to change the Prod.Storg.Loct in BOM item level by mass methodology through CEWB engineering work bench t-code which is not getting effect in changing the Storage Location at BOM item level
I selected the Item level work bench level and placed the components and given the plant and selected the respective storage location but it is not effectively working after pressing load BOM and Task List execute button.
Any other procedure i have to do let me know the process steps.
And even I recorded a program for CS02 t-code and given to our ABAP team and they are saying it is complicated to develop a BDC for the requirement
(I would like to know is it so much complicated to develop a BDC for it) please specify the comments on it as well.
It will be great if i have a quick response on it.....
Regards,
Madhu.G
Hi All,
Sorry for the previous thread there is a small correction the selection criteria was wrongly done from my side any ways i got the solution for it. Now issue is closed and it is not necessary to write the BDC as well...
Utilizing the CEWB it self we can change in mass but it takes quite time to load into the data any ways it requires hipper care while executing the data changes in it
Another best thing is BDC will be much accurate to work on it.....
Regards,
Madhu.G
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Madhu,
The complexity depends on your business scenario.
Which type of BOM are you using ? Is it single level, fixed components? In such cases, an LSMW / BDC also will be enough.
Thanks,
Prem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.