Hi All,
I have certain scenario in QM which I would like to share it here and get some response:
One material say X is (not SAP batch managed). I need to do Inspection for the same before I go ahead with GR.
Now, the tricky part is, even though its not batch managed in SAP, it comes with different vendor batches. Now I expect inspection lot to be created for each vendor batch. So that I can do inspection of the particular vendor batch and decide whether this vendor batch is good enough to do GR!!!
Could you please help me out.
Regards
Shiju
Hi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rajendran,
Thanks for the reply.
I understand the use of distributing the qunatity in MIGO. But my requirement is to have it done before GR.
Also, I may be wrong, but I think that we cannot have Vendor Batch field in MIGO, if the material is not batch managed, as both the field comes under batch tab.
For my requirement, even though the material comes with vendor batch, its not batch management in our SAP system.
Regards
Shiju
Hi
As you may not able to declare the Vendor batch quantity at the time of PO you have to use the above method.
Since the material is not batch managed Batch tab will not be available in standard GR process. you can use some text field at item level to mention the vendor batch no.
If you can declare the vendor batch quantity at the time of PO creation, then create as many line item in PO.
Hope this is what you are looking for.
Seperate the items of purchase order by vendor batch.
Then you can create source inspection lots for each vendor batches.
or activate the batch management.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kim,
Thanks for the reply.
Separating the items in PO based on vendor batch would be a difficult task at all times.
Secondly, the batch management cannot be activated as internally once the GR is done, the material is not maintained in batches in downstream like Consumption to Production etc.
Regards
Shiju
Hi Experts,
Could you please look into the query and guide.
Regards
Shiju
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pl explore Source inspection. That might fit into your scenario
ntn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nitin,
I checked Inspection at Source too. But the real worry is to handle the scenario for multiple vendor batch.
Source inspection lot is created with the purchase order/vendor. And if I need to control the vendor batch lot creation, I need to enter the vendor batch in PO itself which doesn't look practical each time.
Regards
Shiju