on 11-21-2014 12:59 PM
Dear Gurus,
For example I have a material A, it has a child item B and B has child item C. So BOM structure is A---> .1 B ----> ..2 C. Now I have a sales order for A and I want MTO for all level of replenishment, i.e. I want MTO production plan for A which is connected to sales order then MTO for B which is connected A and also MTO for C which is connected to B. Currently I am able to connect up to B, i.e I was able to produce MTO for B which is connected to A, but I failed to connect C to B thus every time it produces MTS planned order. It would be super helpful if someone can let me know how do I create MTO for C.
Thanks in advance.
Tanveer
Hello Tanveer,
You must select individual/collective indicator either 1 or blank. After this change, run MRP again system will create MTO planned order for component C as well.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
10 | |
5 | |
5 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.