Viewing requirements generated after running MRP (MD50)

Former Member
0 Kudos

Hi All,

I would like to know if there is any way to check for all the requirements that have been raised subsequent to running MRP using MD50. We have an MTO scenario and want to cross-check if the requirements for raw materials are being accurately generated.

This cross-checking requirement has risen due to the fact that there are many alternative BOMs for each material and there have been instances where due to errors in the material master, some raw materials are suspected to be missing out from the list of requirements generated.

Thanks!

Praveer

Accepted Solutions (0)

Answers (1)

Answers (1)

kiran_kumar179
Active Contributor
0 Kudos

Praveer,

Check MDKP table for list of materials for which last MRP run date.

Run MRP in MD01 for if in case MTO Raw materials has MTS relevancy this way you can include all materials for MRP.

BR
KK