on 11-24-2014 8:56 AM
Hi Everybody ,
System features
Windows Server 2008 R2 64
24 Gb Ram
4 Processors
Business Objects 4.1 Service Pack 4 patch 1
Web Intelligence Reports which scheduled , stuck in running state generally . For example I scheduled a report hourly or 2 hours , Some hours but not specified ,report is stuck in running state . it doesnt complete.
What can I do about this issue ? Could you help me please ?
Has anyone tried SAP Note 2239864 - Scheduled web intelligence reports remain in running status with BI4.1? Add parameter -type outproc -forceterminate to job server properties.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We were recommended this same fix by SAP but it hasn't helped to solve the issue. In our environment, the scheduled reports won't get to running state or pending.
After spending many many days on this issue, we have created a script that alerts the support team and restarts the Job Server in case of schedule being missed to run.
Hi,
How much time does the report take to generate when you refresh on demand?
Regards,
Deepti
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
we have max concurrent jobs set to 40 for crystal and 7 for webi and 20 for publications.
We have more crystal reports runs than webi. As we see that the scheduling jobs go into running state...once in a week...can this max concurrent jobs count increase would resolve the issue.
can we increase this count , if so to what extent can we increase?
Hi,
are there any kind of lock entries. i mean at sap level or DB level.
Regards,
Deepa.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
i have the same issue in bo4.1sp6 fp 6.6.
we have a clustered environment and there are some reports which are scheduled for every 2 hours.
the schedules are going to running state and never finishing.
at the same time I can refresh the same report without any issues.
did anyone found a solution?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
even we are experiencing the same issue. We have around some 500 odd scheduling jobs(crystal reports, webi and publications) running on daily basis.
Environment: BI 4.1 SP5
Suddenly the jobs go into running state and they never complete.
The only work around I could see is to restart SIA where AJS is configured which has been helping me till now. But this is production, everytime this service restart is inturn adding manual effort as I have to re-run all those failed instances during this service restart..
I am new to BO, why has no one found a solution till yet. even SAP is unable to pin point this issue. They ask logs and all that stuff...no one has right knowledge on the metrics of Adaptive job service.
Still beating around the bush...please help us if anybody has found a solution.
Have the same issue here, 4.1 SP6. 1 out of 100 times (we have lots of schedules) the report is stuck at running and the next schedule runs fine again. That running job does take up a slot on my job server which makes it a pain, because eventually I'll run into "no free slots on job server" situation.
Still looking for a solution, haven't found one yet.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Problem reports is reading data from Data Ware House Database - ETL . Normal reports which is reading data from live database , have not problems about schedule .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Create one new job server and disable the existing jobserver then try to schedule the report.
Regards,
Ilaya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Per you description,
You have a recurring schedule which sometime completes and sometimes is stuck in running status?
Could you please let us know the below details:
1. When did this started to occur? were any changes made to system which you think, which might have caused the issue?
2. How many Job server do you have , with WEBI SCHEDULING service
3. Click on the running link in the and see which job server the request is going and is it the same job server everytime ?
4. What happens to this running schedules? Do they fail with error or they complete sucess full after some hours ?
Regards,
RVS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
May be this issue happen, more than one report scheduling at Once, If some report take to run long time for example database query tokes too long.
Try at the time schedule only one report and check the status.
Regards,
V Srinivasan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.