on 11-27-2014 8:34 AM
Check the below setting
Customizing Settings for QM in EWM - Quality Management (QM) - SAP Library
If your all settings are correct, Inspections documents are getting created in SAP EWM system after GR, then check the SMQ2 in ECC system for the particular inbound delivery, which can give you details why Inspection lot is not getting creating in ECC system.
Also, check SLG1 as soon as you posted GR.
Thanks,
Sandip
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.