cancel
Showing results for 
Search instead for 
Did you mean: 

Universal Work List-UWL (MSS)

Former Member
0 Kudos

Hi Gurus,

I have enabled the UWL in MSS and Tasks like leave request is not getting retrieved from the back end.

The work items are getting displayed in SWI1 and request are in SBWP.

Please let me know the correct procedures to configure the same.

Regards,

Vikram A V

Accepted Solutions (1)

Accepted Solutions (1)

rajeshkothamasu
Active Participant
0 Kudos

Hi,

create the system alias in system administration

In system administration register -> Universal work list  -> Register the component and enable the feature and test there, see are u getting an errors. No errors are there means everything is perfect.

Regards,

Rajesh K

Former Member
0 Kudos

Hi Rajesh,

Thanks for the information, but we are not getting the path what you mentioned in portal.

Please can you  briefly explain the path where we should create the system alias and what should be the system alias name for the same.

We are using the Portal 7.3, ECC 6.0 and Ehp 6.

Regards,

Vikram

Former Member
0 Kudos

Hi Rajesh,

1. Registered the required components like SAP_ECC_Humanresources.

2. In RFC destination, created workflow connector.

Now i am receiving the Leave Request in UWL.

Regards,

Vikram A V

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi.

1. Check through t.code ST01 if You have problems of authorizations.

S_UWL_SERV

2. Check the note1133821 - UWL Destination Service configuration

3. Check this links:

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/d0731bbc-810b-2a10-7fb8-900f16fd3...

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/20f4843e-314f-2a10-2a88-8c4afa20d...

Regards