on 11-28-2014 4:11 AM
Hi
I am not clear on upgrading neweaver component.
My solution manager 7.1 is on basis 702, so that would be Netweaver 7 EHP2?
Can I upgrade it to NetWeaver 7.3 EHP1 or NW 7.4? If so how?
I have a SAP ERP 6.0 EHP4 ides system, which is on netweaver 7.1, can I upgrade it to Netweaver 7.31 as well?
How can it be achieved without upgrading the system to EHP6? or the concept is not logical?
Hi Adrien,
You want to upgrade anything before you can check with PAM:Product Availability Matrix
service.sap.com/pam
As you mentioned update solman 7.1 SP12 to NW 7.31 is not possible, you can check with below screenshot.
And SAP ERP 6.0 EHP4 / netweaver 7.1 ----------Netweaver 7.31 also not possible, you can check with below screenshot.
Regards.
Pravin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Nopes you can't update solman 7.1 SP12 to NW 7.31.
Also, you should not do this for ehp4 systems too.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.