HI Experts Is it possible to change a price control from V to S for a valuates Sale / Project stock (not in the material itself by mm02) Thanks
Hi
Price control change from V to S is possible but in following cases you can't do that:
1. If the material is subject to split valuation
2, If standard cost is coming from costing and not equal to MAP (V)
Other than above 2 conditions you can change