cancel
Showing results for 
Search instead for 
Did you mean: 

SAP PI planning

former_member187587
Contributor
0 Kudos

Hi guys, I

               

  1. We currently have 2 PI systems: PI dev and PI production.
  2. We have installed a standalone AAE (advance adapter engine) on the DMZ ,for security reasonse, and configured it to work with the PI dev .

My Q:

Is it possible to use the same AAE both for PI dev  and PI production? Or a dedicated installation of another AAE should be carried out to connect the production?

appreciate your insights.

Accepted Solutions (0)

Answers (1)

Answers (1)

azharshaikh
Active Contributor
0 Kudos

Hi,

AFAIK - its should be a separate AAE for Prod.

Please check the following threads for info:

Regards,

Azhar